Sewer Rehabilitation & Replacement

Design Build Headworks Bldg. Repair & Stop Plate Installation

Project Description

90 day sewer bypass of complete headworks facilities for repairs.

Challenges

Replace Wastewater Treatment Plant Headworks for City of Fresno/Clovis bypassing flows for 90 days, determine means and methods of handing primary solids, grit, and plant communication.

how we solved it

  • Designed and installed grit settling chambers and processes for cleaning during live operation
  • Electronic flow monitoring and reporting for successful plant operation and coordination
  • Designed and fabricated a serviceable screening system for primary solids removal
  • Monitored and maintained the flows 24/7

Project Details

  • Project Type:

    Sewer Rehabilitation & Replacement

  • Project Size:

    Bypass Flow: 150MGD (278cfs);

    Bypass Length: 1,300 LF of multiple 18” and 36” HDPE Pipelines

  • Location:

    City of Fresno